KD Project – Vung Ang Thermal Power Plant 1

Company information
icon date25/07/2023

Location: Ky Loi Commune, Ky Anh Town, Ha Tinh Province
Value: 200.44 billion VND
Category: Procurement of supplies

Vung Ang 1 Thermal Power Plant was built in Ky Loi commune, Ky Anh town, Ha Tinh province.
Vung Ang 1 Thermal Power Plant with a capacity of 1,200 MW (2x600MW) has been put into commercial operation for unit 1 from December 31, 2014 and unit 2 from May 12, 2015. Since being recognized for commercial operation (January 1, 2015) to the end of June 30, 2022, the plant has generated 38.91 billion kWh of electricity.
It is a coal-fired power project with a large capacity of the unit, using advanced, high-efficiency direct injection coal burning technology, meeting well the requirements of environmental protection.
With the presence of Vung Ang 1 Thermal Power Plant, the North’s power supply, which is facing a lot of difficulties, has been greatly supported.
The annual revenue of the factory is about VND 7 – 8 trillion, making an important contribution to the group’s total revenue and making a significant contribution to central and local budget revenues.
Petroleum Machinery – Equipment Joint Stock Company is honored to be one of the suppliers of machinery and equipment for the project. Some typical recent contracts:
– Buy ball valve online for coal mill 2A, 2B, 2C. 2F – Vung Ang Thermal Power Plant 1
– Purchase of consumables for fuel system conveyor rollers in 2022
– Purchase of materials to overcome the abnormality of the slag discharge system of Vung Ang Thermal Power Plant 1